Links, activity log, and settings
Cross-Site Sync administration lets you review links between local and remote work items, check activity, and adjust how the app works.
Review links
Open Links to search by local or remote key and filter by state, connection, or rule. The list shows the source and remote destination, state, last sync, and latest known error.
A link is the relationship Cross-Site Sync manages between the two work items. Do not assume Jira will display a native issue link between them.
If the remote work item remains in Done for the period configured in the rule, the link is archived and the app stops checking it for status changes.
Check the activity log
The activity log keeps up to 90 days of activity and supports searches by work item key or correlation ID. Each entry shows the operation, result, time, and a message to help diagnose the issue.
The log does not store comment text or attachment content. If an operation fails, review the message, connection, and rule; then retry from the panel if appropriate.
Adjust the app
Administrators can change:
- How many days to retain the activity log.
- How many syncs can run at the same time per connection.
- The thresholds for token expiry notices.
Changes are recorded in the activity log and take effect in the next cycle. Jira administrators can access the settings page.
Pause and deactivate
Pausing a sync temporarily stops sending pending changes. When you resume it, the app can continue with the changes it kept. Deactivating a connection stops its rules but does not remove existing links.
Version 1.0.0 does not support unlinking or relinking work items. Pausing is not the same as unlinking.