Overview and first steps
The administration Overview brings together setup progress, connection health, and items that need attention. It helps administrators find the next step without leaving Cross-Site Sync.
Connections
A connection stores access to a remote Jira Cloud site. Only Jira administrators can create or edit a connection, rotate its token, or deactivate it. The list shows its status and the token expiry date, if configured.
Sync rules
A rule defines which work item to create on the remote site, when to create it, and what content to transfer. Before creating one, set up an available connection and make sure the technical account can create work items in the destination space.
Escalation from a workflow
To create a remote work item during a transition, add Validate escalation (Cross-Site Sync) and Escalate to remote site (Cross-Site Sync) to the local workflow. The validator does not require a configuration screen; it checks the required fields from the rule. The post function has a screen for selecting the active rule.
Links, activity log, and settings
The Operations tab helps you find linked work items, review errors, and check activity. The Settings tab lets you change activity log retention, expiry notices, and the maximum concurrent jobs per connection.