Changelog
Release 1.0.0 · Forge 2.0.0
First public release of Stratify for Jira: a configurable hierarchy and Gantt planning, with a sandbox before writing to Jira.
✨ New features
- Configurable hierarchy: Parent Element / Elemento Superior field and Parent → Children admin panel (a type tree, not a linear list).
- Multi-project Gantt: one JQL feeds bars from several projects (according to permissions), with zoom/pan, start and end dates, and saved plans.
- Nesting: bars group according to the hierarchy and the Parent Element field; levels can be expanded and collapsed. Issues without a parent in the view are grouped explicitly.
- Sandbox (Draft): dragging, stretching, or editing dates does not write to Jira until Sync. You can discard the draft.
- Bulk sync: send every draft change to Jira, with a per-issue summary. On partial failure, successful drafts are cleared and failed drafts are kept with the error.
- Estimate roll-up: each parent shows the sum of Story Points or hours of visible children.
- Optional date roll-up: toggle (off by default) that extends the parent in Draft when a child slips past its finish date.
- Blocks dependencies: Blocks / is blocked by arrows and red visual alerts if a blocked task sits before its blocker. The alert does not block save or sync.
- Language: UI in es-ES (default) and en-US, according to the Jira locale.
🔧 Scope of this version
- First install on Jira Cloud (Forge). After install, associate the Parent Element field with screens and configure the hierarchy.
- Does not include team capacity, budget, or real objectives. Those features do not appear in the app.
- Compatible with Jira Cloud. Requires JQL read permission and date-edit permission to sync.